Skip to main content

Explain why the gem-dimethyl groups appear as separate peaks in the proton NMR spectrum of isoborneol although they almost overlap in borneol.

We are talking about the difference between the structures of borneol and isoborneol (see the structures of both compounds in the link referenced below).  Both are bicyclic molecules with the norbornane structure at their cores.  The gem dimethyl group in question is the carbon at the top of the structures with two methyl (CH3) groups attached to it.  The only difference between the two molecules is the spatial orientation of the hydroxyl (OH) group.  In borneol, the hydroxyl group is pointed down and away from the gem dimethyl group.  In isoborneol, the hydroxyl group is pointed up and toward the gem dimethyl group.  Since NMR distinguishes between chemically unique hydrogen atoms, the hydroxyl group in isoborneol affects the methyl group that is pointed toward it but not the methyl group pointed away from it, thus the two methyl groups appear as two different peaks in the NMR spectrum.  In the case of borneol, the hydroxyl group is pointed in the opposite direction and therefore exerts essentially no effect on the gem dimethyl group, thus it appears as a single peak in the NMR spectrum.

Comments

Popular posts from this blog

Is there a word/phrase for "unperformant"?

As a software engineer, I need to sometimes describe a piece of code as something that lacks performance or was not written with performance in mind. Example: This kind of coding style leads to unmaintainable and unperformant code. Based on my Google searches, this isn't a real word. What is the correct way to describe this? EDIT My usage of "performance" here is in regard to speed and efficiency. For example, the better the performance of code the faster the application runs. My question and example target the negative definition, which is in reference to preventing inefficient coding practices. Answer This kind of coding style leads to unmaintainable and unperformant code. In my opinion, reads more easily as: This coding style leads to unmaintainable and poorly performing code. The key to well-written documentation and reports lies in ease of understanding. Adding poorly understood words such as performant decreases that ease. In addressing the use of such a poorly ...

A man has a garden measuring 84 meters by 56 meters. He divides it into the minimum number of square plots. What is the length of the square plots?

We wish to divide this man's garden into the minimum number of square plots possible. A square has all four sides with the same length.Our garden is a rectangle, so the answer is clearly not 1 square plot. If we choose the wrong length for our squares, we may end up with missing holes or we may not be able to fit our squares inside the garden. So we have 84 meters in one direction and 56 meters in the other direction. When we start dividing the garden in square plots, we are "filling" those lengths in their respective directions. At each direction, there must be an integer number of squares (otherwise, we get holes or we leave the garden), so that all the square plots fill up the garden nicely. Thus, our job here is to find the greatest common divisor of 84 and 56. For this, we prime factor both of them: `56 = 2*2*2*7` `84 = 2*2*3*7` We can see that the prime factors and multiplicities in common are `2*2*7 = 28` . This is the desired length of the square plots. If you wi...